PT. Timas Suplindo Project: EPCI for JDA Block B-17-01 Field Development Project, Phase 6 Client: Carigali-PTTEPI Operating Company Sdn Bhd (CPOC) Contractor: Malaysia Marine and Heavy Engineering Sdn Bhd / PT. Timas Suplindo. Location: Malaysia–Thailand Joint Development Area (MTJDA). Project Period: July 2025 Project: PHM Sisi Nubi AOI Development Project Client: Pertamina Hulu Mahakam (PHM) Contractor: PT Meindo / PT. Timas Suplindo. Location: Indonesia, Balikpapan Project Period: Jan 2025 – July 2025 Project: Gansar LWS, Duyong Brownfield Modification and Host Tie-in for PM 6 & 12 Gas Gansar Pipeline Installation Client: PETRONAS Carigali Sdn Bhd (PCSB) Contractor: Muhibbah Engineering (M) Berhad (MEB) / PT. Timas Suplindo. Location: Malaysia Project Period: Feb 2024 – May 2024 Project: Medco Terubuk Development Client: PT Timas Suplindo Location: South Natuna Sea, Indonesia Project Period: Completed: 2024 Project: Sriracha Subsea Crude Pipeline Capacity Maintenance Project Client: ETL – Esso (Thailand) Public Company Limited Location: Sriracha Thailand Project Period: November 2020 – November 2021 Project: Star Petroleum Kakap Field Redevelopment Client: PT Timas Suplindo Location: Indonesia Project Period: 2017 Project: Pipe Lay Systems on PL1 Client: Pioneer Offshore/ TIMAS/ Asia Petroleum Development Location: India Project Period: 2014 Project: ConocoPhillips North Belut Bridge Engineering And Project Management Client: PT Timas Suplindo Location: Indonesia Project Period: 2012 Project: Conoco Phillips North Belut Subsea Cable Installation And Project Management Client: PT Timas Suplindo Location: Indonesia Project Period: 2012 Project: HESS (Indonesia-Pangkah) Ltd Phase II Transportation And Installation Client: PT Timas Suplindo Location: Unjung Pangkah Project Period: 2011 Project: HESS Indonesia Pangkah Engineering And Project Management Client: Hees Indonesia Pangkah Location: Indonesia Project Period: 2010